Tuesday, January 26, 2010

Pool Progress

We're on about day 90 since pool digging started, so I thought I'd post a progress update.  The yard is still in a fairly unpleasant state - but that's pretty much what we expected (although we didn't expect it for quite this long), there have been delays caused by Christmas, permit issues, rain, and other stuff that I don't understand.

Anyway, here's the pool, it's been tiled and had the coping put on - the sticky up bit you can see is the skimmer.

Pool Progress
This is the wall that caused all kinds of delays with permits.  This will be filled in and then concreted on the top.
Pool Progress
Given the rain, the pool is filling up with water. The light has been attached to the wire (on the right) and left in it's box in the middle, for about 2 months now.
Pool Progress
These pipes will go to the roof, where the solar panels heat the water.
Pool Progress
This is the filter and pump and stuff, with the trenches that have the pipes in them.  Hopefully they'll be filled one day.
Pool Progress
They've finished building the wall, but there are a lot of bricks and things still lying around.  I'm not sure if they're going to serve a purpose, or if they'll take them away.
Pool Progress
Here's another shot of the wall.
Pool Progress
And some more wall.
Pool Progress
Close up of the light.
Pool Progress
This is the wall that was demolished to let the digger in,a nd which has now been rebuilt.  The new wall is a lot sturdier than the old wall, but it's a tiny bit wider, and so the garage door scrapes on it when it's opened.
Pool Progress
The other side of the wall doesn't look so good at the moment.
Pool Progress

Wednesday, October 28, 2009

Pool, day 6 (18)

After the rebar was put in, we had a lull of 10 days, while stuff was ordered. But it duly arrived, and then people came to put the equipment into place, and do the plumbing and wiring.

Here's the pool, with some pipes and stuff in it.

Pool, day (lost track)

This is what they always call 'the equipment'. Because it's just a filter / chlorinator, there's no heater, and it's much smaller than normal. The pool will be a salt water pool, which I don't really understand. The chlorine is attached to sodium which makes it salty - so it still has chlorine to kill the beasts that you don't want, but it's not all nasty and chloriney. And the water feels different too.

Pool, day (lost track)

This bit is called the skimmer, it's where the stuff that floats on the top gets trapped and filtered out.

Pool, day (lost track)

And here's the light. I still don't see how we will change the bulb.
Pool, day (lost track)

The inspector (from the council) came yesterday to, inspect. He seemed happy with everything, except the fences, which he said weren't high enough, because they had to be five feet high - but they are five feet high, which confused me. The gates need fixing - they need to close and latch automatically - we knew about that.

We need to get pool alarms for the doors from the house fitted. I looked online at Amazon, and a couple of people mentioned in reviews that these alarms were approved by their council. That made me a bit nervous, so I went to a pool supply store, and bought them there, for $80 each. The alarms have to be high enough that a child can't turn them off - when you open the door, you have 7 seconds to press the button, and then 14 more seconds to get through the door and close it (at least, that's my understanding). You should not be able to remove the alarms without using tools - so no tape or velcro to attach them to the door. I had quite a hard time finding all those rules - the LA County website was pretty useless, but eventually I found the Los Angeles Design and Construction of Swimming Pools Regulations.

It's not obligatory, but we're also going to get a pool alarm, which will go off if anything large falls into the pool (like a dog or a child).

Friday, October 16, 2009

Day 4

Day 4 of pool construction. Not much happening today - partly 'cos it's been raining for the last couple of days, and the hole is now full of muddy water, so all they did was empty it. Oh, and they brought some metal bars.



We got a 9 page document from Mr Carlos Pools, telling us what we are supposed to do and not do while they're building the pool. It might have been more helpful if we'd had this when we started, 'cos it says things like "The plans and inspection card willbe placed in a plastic envelope ... DO NOT MOVE, REMOVE or DISTURB ANY OF THE CONTENTS. Leave the envelope and its contents exactly where left." I mean, why would we do that?

"DO NOT ALLOW DOGS TO RUN LOOSE AFTER THE EXCAVATION OF THE POOL ...". Oops. I picked up the poop, so maybe they won't know.

"KEEP CHILDREN AND PETS AWAY FROM THE EXCAVATED POOL, ... PARTICULARLY THE EDGES." Well, as long as they don't watch the video. Anyway, no one fell in, so that's OK.

Today, which is day 5 of work, but day 8 since they started, they're putting the steel reinforcing bars in.

Thursday, October 01, 2009

Permits! Digging!

We have got permits for a pool (apparently - I haven't seen them, but I believe them when they tell me we have). They will come on Friday (that's a week today) and start digging. Digging should take two days - they might finish on Saturday, if we're nice to them, or might finish on Monday.

We want to use some of the soil to try to make parts of the yard less steep - but there is quite a lot of stuff in the way. Some paving stones, the compost heap, a weird bench thing (made of three pieces of stone - it's very, very heavy, and falls over and apart when I try to put it together). I wonder if we can just bury it.

Thursday, September 03, 2009

We've commissioned Mr Carlos Pools

A letter, and a blank piece of paper.
We've spent months since we moved in agonizing and thinking and having people over and then agonizing and then thinking some more about getting a swimming pool . On Sunday we finally bit the bullet, and got Steve, from Mr Carlos pools, around for the third time, and made him measure and think and draw plans and calculate and measure again, and so on. Steve seemed to know what he was talking about more than some of the other designers we had, didn't suggest that we needed a landscape designer (that made S really cross) and also was amongst the cheapest.

Then we signed a contract to build a pool in our back yard.

But there's a weird Los Angeles (or maybe California, or somewhere anyway) that if you want a pool that's seven feet deep, you have to be seven feet from the neighbors. Unless you get permission from the neighbors, in writing. Trouble is our neighbor is about 107 and bedridden, and we've never seen, let alone spoken to her. (We know she exists, because an ambulance turns up once in a while, with red flashing lights, to revive her; or something). Anyway, you don't have to get permission if you write them a letter (recorded delivery) and they don't respond within 30 days. And we think that her responding is pretty unlikely.

So the nice people at Mr Carlos and Associates (weird name for a company - but apparently it was started in the 1950s, and Mr Carlos is still about) said that they would send me a letter as an example of what to write to her. Except they don't have a scanner, and I don't have a fax. So they copied it and posted it. Except they were too moronic to notice that the photocopy (which was of a fax) was so poor that they might as well have sent a blank piece of paper.

So, in our usual fashion of finding highly skilled tradespeople, we expect people who can't read (it appears) to be able to build a swimming pool made of steel and concrete and electricity and chemicals. (And water, I suppose.)

But maybe it's different people. We'll see.

Picture at the top shows the letter they sent on the bottom, with a random letter that I had lying around (it's actually about driving in Mexico). The letter they sent really is the right way up.