Now we know about the pool restrictions, we are in the stage of planning and permits. The people at Mr Carlos pools will apply for a permit to build a pool from the city. The city might decide that we live on a hill (I'm not sure why it's something that needs deciding, but I won't trouble myself with that). If it turns out we do live on a hill (and I'd say it was pretty obvious we do) we'll need a soil grading report, which will cost $450 and delay things.
If we don't need a soil grading report, they'll start digging in (optimistically) 10-11 days. After they have dug the hole, then the inspectors from the city will come and do whatever inspections they do.
On Saturday, someone is going to come and put fences on the walls - the fences need to be 6 feet high - this is part of the inspection. We also need to get the gates fixed - they have to be self closing and automatically locking.